Truckies can expect delays of up to 10 minutes when using the Burdekin Bridge in Queensland from tonight (December 5) until Friday, December 13 due to general structural maintenance work.
The Department of Transport and Main Roads said the important safety upgrades require single lane closures and a contraflow between 7.30pm and 4.30am, on each of those days, except for Saturday, December 7.
Oversize vehicle or wide loads greater than 3.3 metres are required to provide a minimum of two hours notice before crossing the bridge.
The existing height restriction of 4.5 metres remains in place.
For more information about the oversize and wide load restriction please contact the onsite supervisor by calling 0407 690 314.