News

Upcoming changed conditions for Cunninghams Gap

On the Cunningham Highway at Cunninghams Gap, there will be upcoming nightly stop/slow traffic conditions in place for bulk excavation works.

From 6pm until 6am the following day, stop/slow traffic conditions will occur from:

  • Sunday March 30 until Friday April 4 2025
  • Sunday April 6 until Friday April 11 2025

This will also impact OSOM vehicle movements through the site. The maximum vehicle dimensions able to pass through during these times are as follows:

  • Maximum vehicle width: 4.5m (ground contact)
  • Maximum load width: 7.5m (load must clear 1.2m above ground)
  • Maximum length: 60m (including block trucks)

During the works, a reduced speed limit of 40km/h will be in place, with traffic control onsite.

Transport and Main Roads (TMR) advises that during the nightly works, alternative routes should be planned accordingly.

TMR has also advised OSOM operators to:

  • Contact Brett the Site Supervisor by calling 0499 868 491 two hours prior to arrival on-site on the night of travel.
  • Contact the project/s traffic control on UHF CH40 when approaching the site and stop and hold in designated OSOM holding bays until released by traffic control.

Leave a Reply

Your email address will not be published. Required fields are marked *

Send this to a friend