There will be changed overnight traffic conditions from this weekend on a section of the Pacific Highway for maintenance work, including asphalt rehabilitation.
Transport for NSW will carry out works between Failford Road, Failford, and Tritton Road, Possum Brush in the northbound carriageway, with traffic contraflowing on the southbound carriageway.
Work will begin on Sunday January 11, and take place between Sunday to Thursday from 7pm to 5am. It’s expected take two weeks to complete, weather permitting.
Traffic control, contraflow arrangements, lane closures and a reduced speed limit of 40km/h will be in place.
Operators of General Access Heavy Vehicles and Over Size and/or Over Mass (OSOM) Vehicles with a ground contact wider than 4 metres will need to call ahead on UHF Channel 24 to be escorted through the work site.
