News

Heavy vehicle restrictions at Gold Coast Bridge

Heavy vehicle restrictions will be in place at a Gold Coast bridge from this weekend as widening works are carried out.

From 3pm this Saturday July 23 until 5am Wednesday July 27, a southbound lane closure will be in place for heavy vehicles on the Tallebudgera Creek Bridge.

Heavy vehicles must utilise the right lane.

Overmass vehicles will only be permitted to use the Pacific Highway and must use the right hand lane over the Tallebudgera Creek bridge.

Oversize vehicles will have to use the detour via Reedy Creek Road (Burleigh Connection Rd – Exit 85) and Gold Coast Highway.

Previous ArticleNext Article

Leave a Reply

Your email address will not be published.

© All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

JOIN OUR NEWSLETTER

JOIN OUR NEWSLETTER
Close